
http://www.apowersolutions.com/wp-content/uploads/wpsc/product_images/STP270.jpg
Sorry Mr. Blake for the online image again, we didn't get a chance to upload of all of the pictures and videos that we took from the interview, so the picture above is kind of what the big solar panel we got from Revolusun. But day 1 of our assembling began today. Nicole and Kyrie started working on it, and from what I heard from them, its going to take a lot of work and time to do this. When Alan from Revolusun was explaining to us, we just have to follow a schematic drawing that he gave to us and hook up all of the pieces, wires, pumps, panels, etc. Theres a lot of tedious work that is put into this process and that will require some supervision by Alan or Mr. Kamalu, or Mr. Blake as well. This project can be very dangerous since we're dealing with high voltages and acid from the batteries. We are very confident that we will make the final project deadline next week Wednesday. After we assemble everything, we will then figure out how we're going to hook it up and then where we're going to put the solar panel, since its so big. Placing the solar panel on the roof will probably be more of a long term project because we would have to build a frame for it, and then properly bolt it in, which we don't have the time nor the experience or certifications to do so. So for now, we're just trying to put together the battery and the pump piece by piece so we can hook it up to the solar panel and get it running by next week Wednesday. We will also be documenting with lots of pictures and notes along the way.
No comments:
Post a Comment